Iron Making Engineering of Huoqiu Iron Mine Deep Project

The total investment of the 10 million tons/year steel project in Huoqiu is expected to be 30 billion yuan. There are three phases of construction and production, namely 3 million tons in phase I, 3.5 million tons in phase ii and 3.3 million tons in phase iii. The main construction contents include main processes such as mining, sintering, pelletizing, coking, iron making, steel making and rolling, and auxiliary facilities such as power supply and distribution, comprehensive pipe network, etc. In the first half of 2019, coking, sintering, rolling, ironmaking, steelmaking and other processes can be put into production. The project will be fully operational by the end of July 2019.

ZECO Valve factory provides oxygen valves, bronze globe valve and flange globe valve and some other industrial valves for Huoqiu Project.

Installation Scene

Packing List:

  • Oxygen Valves DN50~DN300
  • Bronze Globe Valve DN50~DN300
  • Flange Globe Valve DN50~DN300
  • Forged Steel Globe Valve DN15~DN50
  • Forged Steel Gate Valve DN15~DN50

Client Feedback:

ZECO Valve provides high performance products for our iron ore metallurgical projects in Huoqiu to maintain the normal operation of pipelines, which makes us feel comfortable.

Share this article:
Facebook
Twitter
LinkedIn
Reddit
Pinterest

Product Enquiry

Get a free quote

Contact Form Demo